Project Narrative
Project Summary
This narrative is a summary for project the "Home Downstairs Updated Bathroom" to show all details on how good or bad this project was conducted throughout it's lifecycle. A brief background for this project is to Fix Mold ceiling, repaint ceiling, walls and door, replace vanity mirror, update shower curtains, o rings, curtain pole and floor mats. Fix loose toiler and lastly re-caulking all edges on shower panels and shower bed to include around toiler re-caulking. This project was been ran by Zarah Vazquez Ortiz as the Project Manager. The project budget overrun the planned/expected budget by $700.00 more. This project has been set as "Archived" and the project results was Success.
On Wednesday, August 26, 2020, during Initial phase an issue was identified as Mold on the shower ceiling and logged by Joel Jacobson. Roft had a yellow stain spot and it needed to verify to prevent further damage to the roft. was the problem/success occured while executing previous mentioned phase. This issue will have an impact towards knowledge area Project Quality Management by Delay in upgrade bathroom until contracted out to employee to take care of repair of roft damage.. The team came together to had the best reccomendation for this issue by Before deciding to buy material for bathroom upgrade, closely inspect anything to be repaired first. This lesson log will be follow-up by Joel Jacobson. to make sure it doesn't occur again.
Lessons Logs Group Feedback
Avg. Feedback Rating: 4.29 out of 5: 2020-09-11
Rating Scale: 1: Strong Disagree, 2: Disagree, 3: Neutral, 4: Agree, 5: Strong Agree
Question | Rating 1-5 |
---|---|
4 | |
4 | |
5 | |
5 | |
4 | |
5 | |
3 |
Project Result wasn't the original analysis. Original analysis included a full bathroom upgrade. But after multiples contractors evaluation we decided to just keep it clean and do some resh paint and vanities and touch ups. | |
Contractor very friendly, fixed the molded roft in a matter of 3 days. | |
Selection of thing for the bathroom decorations. | |
Seting up by ourself. | |
None |
*KA: Knowledge Area, AVG: Average
Project Narrative
Project Summary
This narrative is a summary for project the "Home Downstairs Updated Bathroom" to show all details on how good or bad this project was conducted throughout it's lifecycle. A brief background for this project is to Fix Mold ceiling, repaint ceiling, walls and door, replace vanity mirror, update shower curtains, o rings, curtain pole and floor mats. Fix loose toiler and lastly re-caulking all edges on shower panels and shower bed to include around toiler re-caulking. This project was been ran by Zarah Vazquez Ortiz as the Project Manager. The project budget overrun the planned/expected budget by $700.00 more. This project has been set as "Archived" and the project results was Success.
Lessons Logs History (1)
Captured Phase: Initial
Logged By: Joel Jacobson
Issue Title: Mold on the shower ceiling
Problem Arised: Roft had a yellow stain spot and it needed to verify to prevent further damage to the roft.
Impact Results: Delay in upgrade bathroom until contracted out to employee to take care of repair of roft damage.
Reccomendations to Apply: Before deciding to buy material for bathroom upgrade, closely inspect anything to be repaired first.
Follow-Up By: Joel Jacobson
Lessons Logs Group Feedback
Avg. Feedback Rating: 4.29 out of 5: 2020-09-11
Rating Scale: 1: Strong Disagree, 2: Disagree, 3: Neutral, 4: Agree, 5: Strong Agree
Question | Rating 1-5 |
---|---|
4 | |
4 | |
5 | |
5 | |
4 | |
5 | |
3 |
Project Result wasn't the original analysis. Original analysis included a full bathroom upgrade. But after multiples contractors evaluation we decided to just keep it clean and do some resh paint and vanities and touch ups. | |
Contractor very friendly, fixed the molded roft in a matter of 3 days. | |
Selection of thing for the bathroom decorations. | |
Seting up by ourself. | |
None |
*KA: Knowledge Area, AVG: Average