Project Narrative


Date: Saturday, November 23, 2024

Project Summary

This narrative is a summary for project the "Replace Home Electrical Panel" to show all details on how good or bad this project was conducted throughout it's lifecycle. A brief background for this project is to Supreme Electric labor and material to complete the following: 1. Replace (1) existing 100 amp 16 Space Panel with (1) new 100 amp panel 24 Space Panel. 2. Updated panel schedule. Bid based on Supreme limiting tracing out of existing circuits to 1 hour for 2 techs. This project was been ran by Joel Richard Jacobson as the Project Manager. The project budget overrun the planned/expected budget by $75.00 more. This project has been set as "Archived" and the project results was Success.


Lessons Logs Group Feedback
Avg. Feedback Rating: 4.43 out of 5
: 2024-05-31
Rating Scale: 1: Strong Disagree, 2: Disagree, 3: Neutral, 4: Agree, 5: Strong Agree
Question Rating 1-5
4
5
4
5
5
5
3
Property owner needed to fix the dry wall and fill the gaps between the panel and the dry wall.
timeline, new upgraded and bigger size panel.
crumbles and cleanup by the owner after work was completed.
seeing the panel working properly and no more light bliking.
N/A
Make sure contractors do an after repair of anything they damage, and not letting the owner taking care of that.
*KA: Knowledge Area, AVG: Average

Project Narrative


Date: Saturday, November 23, 2024

Project Summary

This narrative is a summary for project the "Replace Home Electrical Panel" to show all details on how good or bad this project was conducted throughout it's lifecycle. A brief background for this project is to Supreme Electric labor and material to complete the following: 1. Replace (1) existing 100 amp 16 Space Panel with (1) new 100 amp panel 24 Space Panel. 2. Updated panel schedule. Bid based on Supreme limiting tracing out of existing circuits to 1 hour for 2 techs. This project was been ran by Joel Richard Jacobson as the Project Manager. The project budget overrun the planned/expected budget by $75.00 more. This project has been set as "Archived" and the project results was Success.

Lessons Logs History (0)
Lessons Logs Group Feedback
Avg. Feedback Rating: 4.43 out of 5
: 2024-05-31
Rating Scale: 1: Strong Disagree, 2: Disagree, 3: Neutral, 4: Agree, 5: Strong Agree
Question Rating 1-5
4
5
4
5
5
5
3
Property owner needed to fix the dry wall and fill the gaps between the panel and the dry wall.
timeline, new upgraded and bigger size panel.
crumbles and cleanup by the owner after work was completed.
seeing the panel working properly and no more light bliking.
N/A
Make sure contractors do an after repair of anything they damage, and not letting the owner taking care of that.
*KA: Knowledge Area, AVG: Average